- Primer and first coat of paint is on all interior walls.
- The majority of the interior trim and crown molding is installed.
- The hardwood floors have been completed for the second level. The crew should finish up all hardwood floors by the end of this coming week.

We are feeling good about the paint choice for the great room. Works well with the fireplace.

Hardwood being installed in Anna's bedroom.

Hardwood and trim complete in Sophia's bedroom. Ready for a final coat of paint and the floor stain.

The bonus room floors are installed and trim is almost complete.

Master bedroom.

Master bath.

The dining room is going to be great. In this picture you can see they have started the wainscoting and chair rail. That part will be painted a light khaki/cream color which will have a sharp contrast to the chocolate brown walls.

More crown and trim in the kitchen.